TRAIL RISK REPORTS
Please write date of risk observation, location, and your name.
If you are the one to mitigate the problem, please indicate your name, the location, work hours spent, and date of mitigation.
This data will be used for our annual report to the state.
7 October 2026 Debbie Hutchings. This tree + bittersweet is across the rail trail a little way south of Hall’s Crossing.




© Wendy Grossman. To attach to her report of 1 October 2026
Hi, Everyone, When you work on something someone else has reported, please use the reply function to their post. That helps to align work directly with the problem.
Action taken on Oct 1 news: Clear fallen oak blocking trail….. also….layed down leaning (dead) pine at parking site.
Tom Murray
Toles Gate … appx 800ft. south
Time to complete ..1:15 min
Date … Oct 7,2026 / 10:30 – 11:45
Thank you, Tom…especially for all the detail.
5 September: I walked Mill Pond today and there is tree across the trial just before the turn to do the back side of Mill Pond. You can walk under it unless your are tall!! There is also a rotten, broken board on the big bridge across the stream on the back side.
Cindy
Follow up to “7 October 2026 Debbie Hutchings”
Tree on Rail Trail 400 feet South of Halls Crossing
– Tim and Jane Perry
– 1-hr on site, 2-people
– 08Oct2026 _ The Trail was cleared to allow free passage of bikers and hikers.
– A workgroup/input will be requested at next meeting for disposition of main tree and branches to retain flow of drainage on both sides of trail.
It is now cleared for users in advance of the upcoming holiday weekend.
Ref only: No reply option on original post if link is needed.
As of Oct 1, there were 3 trees fallen across the rail trail between Halls Crossing and River Rd. From south to north, the first one is suspended over the trail at the rock cut. The last one is close to River Rd. All are large–chain saw candidates. I have photos, with embedded GPS coordinates.
See photos and coordinates above.
43° 3′ 22” N 72° 27′ 1” W 23Oct2026 T. Perry
Rail Trail between Halls Crossing and River Rd.
Trees cut and removed to allow free passage of bikers and hikers.
30 mins on site, 2-people
Pics sent to France for ref.
Sink hole north of Halls Crossing has been filled. We’re waiting for info from the state about its cause; also about filling the one south of S. River Rd. Small hole north of Halls Crossing, at 11o’clock from the larger one, is also waiting to be filled.
Sink hole North of Hall’s Crossing has been marked with branches and orange cones. Nicole is speaking with the state about their fixing it. We’ll keep you up to date here.
Awaiting reply from the State.
A representative from the State was on site recently to look at the sink hole. He will be back during the week of June 15th with an excavator to do initial repairs and assess whether more extensive work is needed to address the issue in the long term.
Thank you, Nicole, This is terrific!!! Thanks for “digging” in there with the state!